The solution includes a high spec rig, 10K BOP stack, 10K pumps, 10K power swivel, rig-assist snubbing, 40′ pipe handler, and flowback equipment. This comprehensive solution simplifies logistics, maximizes operational efficiency, enables the clean out of long lateral wells, and minimizes NPT.
Ranger Energy Services offers a comprehensive frac plug drillout & flowback solution for horizontal plug and perf completions.
Related Posts
-
Announcing the Launch of Our New Website
December 15th, 2020